La Cueva Flood Corridor

A shared record and repair pathway for water, soil, access, and safety after the October 24 flood.

Tent Rock formations and pines above the La Cueva corridor
Tent Rocks and road, photographed October 27, 2026.
The place

Water has always made this landscape.

La Cueva is a connected system of wooded slopes, rock formations, roads, channels, crossings, homes, and living ground. The October 24 storm exposed where concentrated runoff is cutting soil, stressing drainage infrastructure, and threatening access and property.

This page holds a factual public record as the work moves from observation toward technical review, jurisdictional clarity, and an appropriate repair path.

Articles

What It Takes to Follow the Water

Tina Trout ·

What changes when neighbors bring what they see from different parts of the same water corridor to one map?

November 26 update

From the site walk to a watershed assessment

At the November 4 walk, Chief Lee Taylor reported sediment blocking the fire station’s apparatus bays and described an eroded crossing he would be unable to take an ambulance across. County Roads and local fire have been asked to help locate the crossing and clarify the conditions that limit access. County crews have restored access after storms, while the contributing drainage and recurring repairs still need review.

Emergency assistance and longer-term planning

On November 5, NRCS reported that it had identified no qualifying watershed impairment or imminent threat for Emergency Watershed Protection at the sites assessed. It described chronic drainage problems and emphasized stable conveyance for excess runoff.

On November 9, NRCS advised that La Cueva could be considered under its separate Watershed and Flood Prevention Operations program. An eligible local sponsor would need to request a preliminary feasibility review. The program can consider measures that protect existing infrastructure. Measures on public land would need to directly benefit downstream private property or communities, with operation and maintenance accepted by the land manager.

The New Mexico Environment Department confirmed that an eligible conservation district can apply for one integrated assessment and design package under the Watershed Protection Assistance Program. The next deadline is March 15, 2027, with the revised application expected in early January. River Stewardship is a separate route for on-the-ground restoration.

Sandoval County acknowledged the request for road and drainage records on November 9. On November 18, it reported that it had located some responsive records in its portal and said it was not required to create a new report. After Tina reported difficulty opening the portal, the County replied on November 19 that she would need to log in there to retrieve the records. The records have not yet been reviewed for this public page. Follow-ups also went to Cuba Soil & Water Conservation District, the County, local fire and emergency management, the Forest Service, NRCS, and NMED. Jurisdiction, maintenance, and sponsorship are still being clarified.

Dated public record

La Cueva: from flood witness to coordinated assessment.

Earlier field record · October 24 to November 4
  1. Flood-producing storm. Overnight runoff damages the corridor and exposes recurring erosion and access concerns.
  2. Initial community field record. Tina walks and photographs safely accessible portions from upper road drainage near Beryl Road through Twisted Juniper toward the lower crossing. The work is preliminary scoping.
  3. Agency outreach begins. Preliminary observations, a planning range, and requests for jurisdiction, technical review, sponsorship, and funding guidance are shared. Cuba Soil & Water Conservation District is identified as the relevant district.
  4. Return walk and expanded photo record. Closer observations and photographs extend the evidence for erosion, drainage crossings, culverts, and potential receiving areas. Treatment ideas remain concepts for technical evaluation.
  5. Residential continuation documented. The lower residential walk is incorporated into the combined review and photo materials circulated ahead of the agency visit.
  6. NMED identifies a potential funding path. Kate Lacey-Younge reports that the area lies in a nonpoint-source priority watershed draining to San Antonio Creek and suggests River Stewardship discussion with Samantha Ferguson ahead of an anticipated spring 2027 RFP. This is program guidance, not an award.
  7. Joint site walk completed. Tina’s post-walk record confirms David Griego, two NRCS engineers, Chief Lee Taylor, and County representation. Chief Taylor describes sediment blocking apparatus bays and an eroded crossing he could not take an ambulance across; the crossing and conditions need precise documentation. Cuba SWCD had been invited; its attendance is not confirmed in the post-walk record.
  8. Clarification and coordination requests sent. Tina asks NRCS for written eligibility clarification and review of a defined downstream protective scope, contacts Jemez District Ranger Jeremy Golston for jurisdiction and specialist participation, and follows up with Tom Swetnam on field data for mapping. A shared post-walk update is sent to agency and local contacts.
  1. County reports responsive records in its portal. After difficulty opening the portal, Tina asked for direct delivery. The County replied that portal login is required. The contents have not yet been reviewed for this page.
  2. NRCS sends written emergency-program findings. The findings apply to the locations assessed. NRCS points to chronic drainage problems and the need for stable overflow conveyance.
  3. Federal feasibility and state planning routes clarified. NRCS describes the local sponsor route for preliminary watershed feasibility. NMED confirms district eligibility for an integrated planning package and gives March 15, 2027 as the next application deadline.
  4. County acknowledges the public records request. The request covers available road maintenance, storm response, drainage, and reimbursement records. The County gives November 24 as its next status or records checkpoint.
  5. Coordination requests sent. Cuba SWCD and Sandoval County are asked to discuss possible roles. Local fire, emergency management, and the Forest Service are asked for access, watershed, and roads information.

Sources include dated field observations, the circulated walk record, written NRCS and NMED replies, and the County's November records correspondence. The walk account reflects community observations and firsthand reports. The agency replies address their respective programs.

Follow-through

What needs an answer next.

Verify emergency access and crossing conditions
Chief Taylor and County staff have been asked to locate the crossing and document when access is affected.
Clarify upstream jurisdiction and maintenance
The Forest Service has been asked for boundaries, existing restoration records, and watershed and roads contacts.
Identify a lead and define the assessment
Cuba SWCD and Sandoval County have been asked to discuss possible roles. The working map and field record will help define the scope.

Tina / Jemez Mountain Bloom is coordinating the requests. Agency roles and timelines will be added as they are confirmed.

The public record

Documents that make the work inspectable.

Photo evidence map

One corridor in two reaches, from the upper road to the breach, then through the residential erosion corridor to the Twisted Juniper washout. The second page notes the continuation toward San Antonio Creek.

Download the two-page map (PDF, 68 KB) →

Public review package

Prepared for the November 4 site walk. Includes the preliminary concept, field record, planning materials, and photographs.

Download PDF (8.3 MB) →

Core assessment

Initial community assessment and repair concepts from the October field work. See the dated timeline for later agency responses.

Read the assessment →

Interactive corridor map

Tom Swetnam’s terrain, drainage, and field-photo map provides orientation. Its modeled flow paths omit culverts and need field verification.

Open Tom Swetnam’s map →
What is being requested

Careful coordination before construction.

The next appropriate steps are confirmation of jurisdiction and maintenance responsibility, technical feasibility and engineering review, landowner coordination and permissions, agency guidance, and an accountable funding path.

Documentation and immediate life-safety measures can continue. No proposed work should be represented as approved, eligible for reimbursement, or authorized before the responsible public entities and technical reviewers determine that status.

What people can add

Useful knowledge has a place here.

Local history, dated photographs, road or drainage records, information about prior repairs, technical expertise, and corrections to the public record can all help this work become more accurate.

Please do not send private addresses, parcel details, or sensitive personal information through a public channel.

Participate

Help make the record more complete.

Share a dated photo or observation, local history, a document, or an exact correction to this page. The form asks what may be published and lets you upload files or share a media link. The Google form requires sign-in; email the editor if that is a barrier.

About this work

A Bloom Blast Signal.

Bloom Blast Signals are place-specific public records: evidence, story, people, and lawful action gathered when a place needs attention. The record is updated as new, verifiable information becomes available.

This site documents a community process. It does not replace engineering, surveying, legal advice, official agency findings, landowner permission, or emergency direction.