Taos Plateau · Editorial
A Gardener Walks Their Garden Every Day
Six years of hide-and-seek and deflection. BLM must stop the Cones Fire Project, end aerial tebuthiuron on the Taos Plateau, and release the public record.
A gardener walks their garden every day. This is a principle of natural farming. You return to the same ground, watch where water moves, see which plants hold and which disappear, notice what an intervention changed, and correct your course. The garden tells you what your plan failed to anticipate. You have to be there to find out.
The Bureau of Land Management has had at least six years to show the public how it has walked the Taos Plateau. Six years to document the condition of the ground, investigate the causes of its degradation, answer conservationists, account for earlier treatments, and make its decisions available for scrutiny.
People trying to follow the Cones Fire Project have faced six years of hide-and-seek and deflection. Residents are left to piece together old announcements, a reposted proposal, inaccessible documents, and assurances that the process has already happened. Now the proposed intervention includes aerially distributing tebuthiuron, a soil-active herbicide, across thousands of acres of the Río Grande del Norte National Monument.
Enough. The BLM must stop the entire Cones Fire Project, including aerial herbicide operations and subsequent treatment phases. BLM must withdraw its authorization, preserve and release the complete administrative and operational record, and submit the project to an independent public accounting.
Aren’t we tired of gaslighting yet? People are asked to accept that the process was settled years ago. Try to inspect what was settled, what BLM did with the public’s objections, and whether the safeguards were followed. The links break and the records we can get leave those questions open. That gap is the deflection I’m calling out.
Six years ago, people already asked the right questions
In 2020 the Cones Fire Project was publicly described as a landscape-scale effort involving approximately 106,634 acres of the Monument, with prescribed fire, thinning, and proposed tebuthiuron treatment of large sagebrush areas. The July 2020 draft environmental assessment contemplated herbicide application on up to 70 percent of approximately 19,580 acres of sagebrush habitat.
This was no quiet technical matter. In August 2020 the Taos News reported on the herbicide proposal. In September, the Rewilding Institute published objections and questions raised by conservationists, including a Sangre de Cristo Audubon consortium. The central demand was elementary: identify the actual causes of ecological degradation and show the results of previous interventions before prescribing another one. They questioned the relationship between grazing pressure and vegetation changes, the record of past treatments, and the consequences for birds and other wildlife. 2020 public objections · 2020 Taos News reporting listing
Those concerns were raised six years ago. Who answered them? Which findings changed the treatment design? Which alternatives were seriously evaluated? Where are the written responses and the evidence behind them?
The agency reportedly reposted the project online in October 2024 without additional public notification. In November 2026, local reporting quoted Taos Field Manager Eric Valencia saying that the broader project was approved in April 2025. Yet the BLM link to its July 2020 assessment currently tells readers: “This document is not currently available.” The recovered July 2020 draft available to this reporting effort still contains sections reserved for public participation and comment analysis, and its appendices are absent. Local reporting, November 5, 2026 · Unavailable BLM assessment link
The public cannot readily inspect the documents BLM invokes to justify what it is doing. A deadline from 2020 tells us when residents could submit comments. In 2026 they still need access to what BLM did with those comments.
What BLM said would happen. What the public still cannot verify.
The agency has had years to prepare this evidence. Put it on the table, in full, without requiring people to reconstruct the project through broken links and secondhand assurances.
Public comments would be considered. Produce the releasable public comments from 2020, the complete comment analysis, the final assessment and all appendices, any finding of no significant impact, and the signed decision. Identify which concerns changed the project and which were dismissed, with reasons. The available July 2020 draft leaves the participation and comment-analysis sections to be completed. Were they completed? Where are they?
Consultation and collaboration would inform the project. The draft identifies Tribal governments, including Taos, Picuris and Ohkay Owingeh Pueblos, the Jicarilla Apache Nation, and the Southern Ute Tribe, among entities considered in scoping. A name on a list is no evidence of what was heard or acted upon. Provide a consultation chronology and a consent-respecting account of the issues addressed, without exposing confidential Tribal information. Who was heard, and what changed?
Past treatments and field science would justify new ones. BLM's October 2026 announcement claimed that earlier tebuthiuron studies showed an average of 75 percent less bare ground and 120 percent more perennial grass cover than untreated plots. Release those studies, plot locations, sample sizes, methods, controls, dates, limitations, and underlying data. The public should be able to test the agency's claims. Which sites were studied, and do they actually represent these treatment acres? BLM announcement, October 21, 2026
The cause of degradation would be understood. A 2023 USGS-linked study found that grass declined both where sagebrush expanded and where it did not, suggesting drivers beyond sagebrush alone, likely including overgrazing. This matters. Removing sagebrush does not, by itself, demonstrate that the pressures reducing grass have been addressed. Release the grazing history, vegetation baselines, competing-cause analysis, and documents showing how the 2023 findings changed the plan. What, precisely, is the cause being treated? 2023 vegetation study
What the ground shows
The erosion photograph above was taken during the November 3 field visit in the broader Taos Plateau monument landscape. Bare soil and small runoff channels are plainly visible, with sagebrush and other shrubs nearby. The photograph cannot tell us whether this particular spot lies inside a treatment unit, how the channels formed, or what a future herbicide application would do. It can tell us that grass cover cannot be assumed merely because sagebrush is reduced. Show us the measurements behind the promise of more grass and less erosion.
Water would be protected. The draft environmental assessment relied on excluding areas where overland flow could carry tebuthiuron away, referring to an exclusion map identified as Map 13. The BLM's October 21, 2026 announcement assured the public that pellets would not be applied near waterways. Rachael Chapman's November 3 photographs show standing water and drainage conditions in the broader landscape. The photographs alone cannot establish whether an application crossed a prohibited boundary; the agency's maps and flight records can answer that question. Release the operational treatment polygons, Map 13, buffer distances, stream and arroyo inventories, rain and soil-condition checks, and every go/no-go authorization. Who walked the ground after wet weather, and who signed off? BLM announcement
The herbicide would be used within its actual restrictions. An EPA-filed label for Spike 20P warns about groundwater movement and states that the product must not be applied where surface water is present. That publicly available label is from 2006 and is not, by itself, proof of which formulation or label governed a 2026 application. BLM must disclose the actual product, EPA registration number, operative label, herbicide-use proposal, applicator credentials, application rates, and written compliance review. Did every planned or completed application meet the rules that actually governed it? EPA-filed Spike 20P label
Wildlife impacts would be understood and managed. Earlier work documented pinyon jay colonies in the Cerro Chiflo and Cerro de la Olla landscape. Show the survey overlays, non-target vegetation analysis, seasonal restrictions, and explanation of how bird habitat and the Monument's protected values were weighed. What did the wildlife evidence change? 2018 pinyon jay survey
Monitoring would test whether the treatment worked. The 2020 draft contemplated quantitative monitoring before herbicide, after herbicide, and after prescribed burning. Release the monitoring plan, baseline readings, permanent plot locations, raw data, thresholds for unacceptable damage, independent review, and reports already produced. What result would cause BLM to acknowledge the treatment was failing and stop?
The public would be able to establish what actually happened. On October 21, 2026, BLM announced a roughly 2,929-acre aerial treatment north of Cerro Chiflo and east of Cerro de la Olla, expected to take about three days in the first two weeks of November. Residents delivered a petition at the Taos office on November 2; others gathered at Wild Rivers. A local observer reported aircraft activity on November 5, and flight-track information warrants investigation. Neither a witness report nor an aircraft track alone proves when or where pellets were released. Publish the actual application logs, GPS tracks, payload and rate records, dates, weather observations, maps of acres completed, contractor reports, and incident records. Did BLM drop tebuthiuron on November 5? Exactly where? How much? Under whose authorization? BLM October 21 announcement · November 5 local reporting
The agreement describes three years of work. Federal project records referenced in the working archive describe approximately 9,851 acres of herbicide treatment over three years, with 2,929 acres identified as the first phase. Produce the complete phased schedule, funding and contracts, treatment-unit boundaries, and authorizations for prescribed fire, thinning, herbicide and related work. How much of the full project has already been carried out, and what remains authorized?
What did BLM actually measure?
The BLM says it wants healthier grasslands, less erosion, stronger wildlife habitat, and better fire resilience. Those are claims about outcomes. They require measurements, site-specific evidence, and a public record showing how uncertainty was handled. They cannot be proven by repetition.
The agency's October announcement also describes tebuthiuron pellets as remaining in the treatment area, while explaining that precipitation dissolves them and carries the active ingredient into soil. The EPA-filed Spike 20P label expressly recognizes groundwater-leaching risk under certain conditions. These statements make the demand for hydrological evidence more urgent, especially on a landscape of washes, ephemeral drainage, slopes, and changing soil moisture. A map made months or years ago cannot substitute for a dated inspection of the ground at the moment of application.
And the administrative record matters as much as the field record. What kind of public process expects residents to trust an approval they cannot locate, comments they cannot read answered, and safeguards they cannot compare with actual flight paths? A broken project link might be a technical failure. Six years of unanswered substantive questions is an institutional failure of accountability.
There is a profound ethical distinction between claiming to steward a place and being answerable for what has been done to it. The public is entitled to know who made the decisions, on which evidence, after hearing whom, with what alternatives, and with what consequences.
The demand is to stop the project
BLM must immediately halt every remaining operation under the Cones Fire Project, including aerial tebuthiuron treatment, subsequent herbicide phases, and other implementation authorized through this project. The agency must withdraw the project's approval. It must preserve all project documents and electronic records, including communications, maps, field notes, GPS tracks, application records, contracts and monitoring data.
Within ten business days, the agency should publish a complete indexed record in ordinary, downloadable public formats, with a clear explanation of any lawful redactions. It should state in writing whether any application occurred in November 2026, where it occurred, which weather and site conditions were checked, and whether any incident or possible label violation has been referred for independent investigation. It should arrange a public field review with local residents, qualified independent ecologists, hydrologists, and appropriate Tribal representatives participating on their own terms.
If an application has already happened, the obligation to account for it does not end with a flight. Publish the monitoring schedule and findings. Investigate possible exposure of surface water, drainage corridors, groundwater-sensitive areas, and non-target vegetation. Release the results even if they contradict the agency's forecasts.
Any future proposal for this landscape should begin again with the land itself, with the people who know it, with the science that already exists, and with a process the public can actually inspect.
A gardener walks their garden every day. If the Bureau of Land Management has done that work, show us the walks, the measurements, the objections, the corrections, and the decisions. If it cannot, it has no business proceeding on the strength of assurances alone.
Stop the Cones Fire Project. Open the record. Account for what happened.
Read the documents
- Read the recovered July 2020 Cones Fire assessment (PDF). The archived draft ends at the references. The appendices and signed decision are still sought.
- Read the Taos herbicide source exhibits (PDF). Includes federal tracking entries, BLM’s treatment map, New Mexico’s recordkeeping rule, and the archived EPA specimen label.
Ask BLM to stop the Cones Fire Project and release the record